Stormwater Management Case Study
Project type
Stormwater Management
Date
Fall 2022
Location
Washington, D.C.
Role
Water Resources Engineer
In this case study I was tasked with providing excel calculations that supported proposed BMP (Best Management Practices) for each site drainage area (SDA's). Proposed 23,967 SF of building with an open courtyard in the middle of the 2nd floor.